Construction site facilities for the construction of Mary Elisabeth Hospital

Construction site facilities for "BørneRiget"

This construction site facility has been built as a flexible and well-functioning base for the many craftsmen and stakeholders involved in the construction of the new Mary Elisabeth Hospital. The construction site facility consists of a total of 44 Maxi Flex modules and has been continuously adapted so that the layout best supports the construction needs and daily operations on the construction site.

The construction site facilities are composed with a focus on functionality and capacity. The construction site facility houses 20 BTO modules with bathroom, toilet and changing facilities as well as four meeting rooms of various sizes, three larger office spaces and well-functioning canteen facilities – all with associated toilet facilities. The layout ensures good conditions for breaks, collaboration, planning and administrative tasks in a busy construction process.

Project Information

  • Contract Type
    Trade Contract
  • Client
    Capital Region of Denmark
  • Scope
    1,408 m²
  • Year of construction
    2021 + 2023
  • Architect
    ABC Pavilions
  • Construction Address
    Edel Sauntes Allé, DK-2100 Copenhagen

Get reference sheet

Download a PDF with information about the project Construction site facilities for the construction of Mary Elisabeth Hospital

Optimal space utilization and clear layout

The building is constructed in three floors to utilize the area optimally and create clear conditions for the large number of craftsmen who use the facilities daily. The external stairs and walkways in steel ensure easy and safe access to all floors and contribute to efficient daily operations on the site.

Heating is provided via air-to-air heat pumps, supplemented with electric radiators in auxiliary rooms, while the building is ventilated with wall-mounted, mechanical ventilation systems. This ensures a stable and comfortable indoor climate – even under changing weather conditions and high daily usage.

Skurvogn med garderobe til håndværker
Skurvogne i tre etager ved Mary Elisabeths Hospital i København
Skurvogn kantine og spiseplads

Should we help you with a similar project?

Do you have a project similar to this, or do you need flexible and well-functioning temporary facilities for a construction site? Then we can help you all the way: from the initial considerations until the finished solution is ready. We provide advice based on your needs and create a solution that works in everyday life and gives you the temporary facilities you need.

Externally, the Maxi Flex modules appear with anthracite gray cladding boards and roofing felt on the roof surfaces, which gives a robust and functional expression that is well-suited for construction site use. The temporary building is erected on tile foundations and is constructed with full sewer connection, rainwater drainage as well as IT and electrical installations, so all technical needs are covered from day one.

The result is a well-thought-out and operationally reliable construction site facility that creates proper and well-functioning conditions for everyday life on the construction site – and which supports a complex construction project with many involved professional groups.